IN ACTION

OFB SOIL IN ACTION

Click on the arrows to cycle through the pictures

1. Scarification of surface to be
treated with a grader

OFB SOIL IN ACTION

Click on the arrows to cycle through the pictures

2. Close-up of hard and
durable road surface after
treatment

OFB SOIL IN ACTION

Click on the arrows to cycle through the pictures

3. Another OFB Bind and Seal
treated surface after Grade
and Roll

OFB SOIL IN ACTION

Click on the arrows to cycle through the pictures

4. Close-up of a durable
working surface created
with OFB Bind and Seal

OFB SOIL IN ACTION

Click on the arrows to cycle through the pictures

5.Council yard treated
with OFB Dust Stop

OFB SOIL IN ACTION

Click on the arrows to cycle through the pictures

6. Another OFB Bind and Seal
treated surface after Grade
and Roll

OFB SOIL IN ACTION

Click on the arrows to cycle through the pictures

7.Driveway treated with
OFB Dust Stop

OFB SOIL IN ACTION

Click on the arrows to cycle through the pictures

8. Close-up of driveway
surface treated with OFB
Dust Stop

OFB SOIL IN ACTION

Click on the arrows to cycle through the pictures

9. A metre square soil sample
after treatment with OFB
Bind and Seal

OFB SOIL IN ACTION

Click on the arrows to cycle through the pictures

10. Various soil samples
after treatment with OFB
Bind and Seal in a pod maker

TIMELINE

Pictoral Timeline of Outback Road treated with OFB Bind and Seal

The figures on the timeline are the number of months since treatment with OFB Bind and Seal. The pictures clearly shows very little deterioration of the road surface after a period of 14 months with inclement weather (road under water for 4 days a month) and no maintenance.

Observations:

• Sub-base over the entire road is smooth, solid and very hard
• Compaction by vehicle tyres has only hardened the surface and has produced no cracks
• There is no rutting or corrugation, and no pot holes
• Vehicles can drive on the road at 100 km/hour with no vibration

Close-up of the road surface immediately after treatment with OFB Bind and Seal

1.5 MONTHS

2.5 MONTHS

4.5 MONTHS

14 MONTHS

Close-up of the road surface immediately after treatment with OFB Bind and Seal

1.5 MONTHS

2.5 MONTHS

4.5 MONTHS

14 MONTHS